SIRS in Florida: The December 31, 2026 Deadline, What It Costs Owners and How to Fund It
A SIRS (structural integrity reserve study) is the reserve study Florida requires for condo buildings three or more habitable stories tall, covering the roof, structure, fire protection, plumbing, electrical, waterproofing, windows and related items. Under section 718.112(2)(g)7, no SIRS may be completed after December 31, 2026. Reserves it calls for cannot be waived.
Key takeaways
- The deadline: condo associations existing on or before July 1, 2022 had to complete a SIRS by December 31, 2025, or by December 31, 2026 if combined with a milestone inspection due by then, and "in no event" after December 31, 2026 (s. 718.112(2)(g)7).
- On November 19, 2026, that leaves 42 days.
- Reserves for SIRS items cannot be waived or reduced by owner vote for budgets adopted on or after December 31, 2024 (s. 718.112(2)(f)2.b).
- Associations may fund SIRS reserves with regular assessments, special assessments, lines of credit or loans; a special assessment, line of credit or loan needs a majority of the total voting interests.
- After a milestone inspection, a majority of the total voting interests may pause or reduce reserve contributions for up to two budgets, for budgets adopted on or before December 31, 2028, to pay for the repairs.
- Within 45 days of receiving the study, the association must give owners a copy or a notice, and file a statement with the Division; each officer and director must sign an affidavit acknowledging receipt.
- Repairs are expensive: milestone repair permits averaged $496,236 for 2025 inspections (OPPAGA, July 2026).
What is a SIRS in Florida?
A SIRS is "a study of the reserve funds required for future major repairs and replacement of the condominium property performed as required under s. 718.112(2)(g)," according to the definition in section 718.103, Florida Statutes. It is required for each residential condominium building three habitable stories or higher, at least every 10 years.
It is narrower than a full reserve study and stricter. It covers only structural and life-safety components, it must be based on a visual inspection, and the reserves it recommends cannot be waived by owners. Other reserve items, such as a pool or paving, are still funded under the general reserve rules in section 718.112(2)(f).
The components a SIRS must cover
| Item | What it covers |
|---|---|
| a. Roof | The roof system |
| b. Structure | Load-bearing walls and primary structural members and systems |
| c. Fireproofing and fire protection systems | Sprinklers, alarms, fire-rated assemblies |
| d. Plumbing | Building plumbing systems |
| e. Electrical systems | Building electrical systems |
| f. Waterproofing and exterior painting | Envelope protection |
| g. Windows and exterior doors | Openings in the envelope |
| h. Any other item over $25,000 | An item with a deferred maintenance or replacement cost over $25,000 (or the Division's inflation-adjusted amount, if greater) whose failure would harm items a to g |
The $25,000 threshold for item h was raised from $10,000 by HB 913 in 2025. Items with an estimated remaining useful life of more than 25 years do not need replacement reserves, though the study may still recommend a deferred maintenance amount for them.
Who can prepare it
The visual inspection must be performed or verified by a Florida-licensed engineer or architect, or by a reserve specialist or professional reserve analyst credentialed by the Community Associations Institute or the Association of Professional Reserve Analysts, under section 718.112(2)(g)2 and 3. Anyone bidding to do the study must disclose conflicts, such as plans to bid on the repair work.
For how reserve studies work in general, read Reserve study basics.
Doing this in a spreadsheet?
hoa.to collects dues online, applies late fees automatically and keeps fund accounting your treasurer can export. Free for 3 months, no card needed.
When is the Florida SIRS deadline?
The final Florida SIRS deadline is December 31, 2026. Section 718.112(2)(g)7 says a unit-owner-controlled association existing on or before July 1, 2022 must complete the study by December 31, 2025; if a milestone inspection is due on or before December 31, 2026, the two may be done together; and "in no event may the structural integrity reserve study be completed after December 31, 2026."
| Who | Date | Statute |
|---|---|---|
| Condo associations existing on or before July 1, 2022 | By December 31, 2025 | s. 718.112(2)(g)7 |
| Same, combining the SIRS with a milestone inspection due by December 31, 2026 | With the milestone inspection | s. 718.112(2)(g)7 |
| Every condo association required to have one | Never after December 31, 2026 | s. 718.112(2)(g)7 |
| Cooperatives | By December 31, 2024; never after December 31, 2026 | s. 719.106(1)(k)7 |
| Repeat studies | At least every 10 years | s. 718.112(2)(g)1 |
| New condos | Developer must have a turnover inspection report for each building 3+ stories before turnover | s. 718.112(2)(g)6 |
| Distribution to owners | Within 45 days of receiving the study | s. 718.112(2)(g)11 |
| Statement to the Division | Within 45 days of receiving the study | s. 718.112(2)(g)12 |
The co-op date is not a typo. HB 913 (2025) moved the condo deadline to December 31, 2025 but the co-op statute still reads December 31, 2024, with the same December 31, 2026 outer limit. Associations that have not finished are already past the primary date and have only the outer limit left.
If your building just had a milestone inspection
Two rules help. A milestone inspection completed within the past 5 years can be used in place of the SIRS visual inspection (s. 718.112(2)(g)8), and the association may delay the SIRS for no more than the 2 consecutive budget years immediately following the milestone inspection (s. 718.112(2)(g)9). Read the delay rule together with the December 31, 2026 outer limit, and ask your association's lawyer how they interact for your building before relying on it.
For what milestone inspections have found statewide, see Florida milestone inspection statistics.
A 42-day plan if your SIRS is not finished
If your association does not have a completed SIRS on November 19, 2026, the job is to get a compliant study completed by December 31, 2026 and to document every step. This plan works backward from the deadline.
| By | Step | Why |
|---|---|---|
| November 24 | Board meeting, noticed as your bylaws and s. 718.112(2)(c) require, to authorize hiring a qualified provider and setting a not-to-exceed amount | Contract authority and a record that the board acted |
| November 25 | Send the provider your milestone inspection report if done in the last 5 years, prior reserve studies, the budget and a component list | The milestone report can replace the SIRS visual inspection |
| December 1 | Signed contract with a completion date before December 31 and the provider's written conflict disclosure | s. 718.112(2)(g)3 conflict rule |
| December 1 to 18 | Site visit and component inventory | The study must rest on a visual inspection |
| December 22 | Draft study to the board, including a baseline funding plan | The minimum funding plan the statute requires |
| December 29 | Final study delivered; each officer and director signs the receipt affidavit | s. 718.112(2)(g)10 |
| February 12, 2027 | Copy or notice to every owner and statement to the Division, if the study was received December 29 | 45 days under s. 718.112(2)(g)11 and 12 |
If a provider cannot finish by December 31, put that in writing, keep every email showing the board's efforts, and get legal advice immediately. The statute makes a willful and knowing failure to complete the SIRS a breach of the officers' and directors' fiduciary relationship to the unit owners under section 718.111(1), so a documented, good-faith effort matters.
What does a SIRS cost?
There is no official survey of SIRS prices, and we will not repeat the unsourced ranges found online. What we can say from official sources is what drives the price, and what the study will cost owners, which is usually far more than the study itself.
What drives the price of the study
- Whether an engineer or architect must do a new visual inspection, or whether a milestone inspection from the last 5 years can be reused.
- The number and height of buildings, and how many components reach the $25,000 threshold.
- How much existing information there is: prior reserve studies, drawings, repair history.
- Timing: a rush job in December, when providers are booked, will cost more if it can be done at all.
- Whether the board wants a full reserve study for non-SIRS items in the same engagement.
For scale, the only official cost figure for building inspections in Florida comes from the Senate's 2023 analysis of SB 154, which cited DBPR: recertification inspections in Miami-Dade and Broward "can cost as much as $20,000 to $40,000 for the inspection of a 15 to 20 story condominium." That is an inspection price from before 2022, not a SIRS price, but it shows why reusing a recent milestone inspection can save real money.
What a SIRS costs owners: the funding math
The study's real cost is the reserve funding it requires. At a minimum, the SIRS must recommend "a baseline funding plan" under which the reserve funding for each budget year keeps the reserve cash balance above zero (s. 718.112(2)(g)4). Most boards will be shown other options too, such as full funding, but the baseline plan is the floor.
Worked example: a 60-unit, 8-story building
The figures below are hypothetical, chosen only to show the arithmetic. Your study will have its own component costs and lives.
| Component | Replacement cost | Remaining life | Already reserved | Annual contribution | Per unit per month |
|---|---|---|---|---|---|
| Roof | $600,000 | 8 years | $120,000 | $60,000 | $83.33 |
| Waterproofing and exterior painting | $360,000 | 6 years | $60,000 | $50,000 | $69.44 |
| Windows and exterior doors | $900,000 | 15 years | $0 | $60,000 | $83.33 |
| Fire protection | $150,000 | 10 years | $30,000 | $12,000 | $16.67 |
| Electrical | $240,000 | 20 years | $0 | $12,000 | $16.67 |
| Plumbing (risers) | $480,000 | 12 years | $0 | $40,000 | $55.56 |
| Total | $2,730,000 | $210,000 | $234,000 | $325.00 |
Each annual contribution is the replacement cost minus what is already reserved, divided by the remaining life. In this example, owners would need about $325 per unit per month for SIRS items alone, before operating costs and non-SIRS reserves. A pooled funding plan, which section 718.112(2)(f)4 allows only among SIRS components, can lower the early-year number because it plans the cash balance across all components rather than each one separately; the baseline plan in the statute works that way.
Run your own numbers with the reserve funding calculator.
SIRS reserves vs other reserves: what owners can still vote on
Florida now splits condo reserves in two. Reserves for the SIRS components cannot be waived, but reserves for everything else still can be, by owner vote. Section 718.112(2)(f)2.b lets members of a unit-owner-controlled association "determine, by a majority vote of the total voting interests of the association, to provide no reserves or less reserves than required," and then removes that option for SIRS items in budgets adopted on or after December 31, 2024.
| Reserve item | Required? | Can owners waive or reduce it? |
|---|---|---|
| Roof, structure, fire protection, plumbing, electrical, waterproofing and painting, windows and doors (SIRS items) | Yes, at the SIRS-recommended level | No, for budgets adopted on or after December 31, 2024 |
| Other items over $25,000 that affect the SIRS items | Yes, if the SIRS includes them | No |
| Pavement resurfacing | Yes (listed in s. 718.112(2)(f)2.a) | Yes, by a majority of the total voting interests |
| Pool, clubhouse, amenities and other items over $25,000 | Yes | Yes, by a majority of the total voting interests |
| Multicondominium with a Division-approved alternative funding method | As approved | Yes, under the approved method |
Section 718.112(2)(f)3 adds that, for budgets adopted on or after December 31, 2024, SIRS reserves may be used only for the SIRS components. A board cannot borrow from the roof reserve to resurface the pool deck.
How the SIRS hits the 2027 budget
Most associations completing a SIRS in late 2026 will feel it in the 2027 or 2028 budget. Florida has a specific rule for large increases: if a proposed annual budget requires assessments of more than 115% of the prior year's, the board must also propose a substitute budget that leaves out discretionary expenditures, and mail or hand-deliver notice of the budget meeting at least 14 days before it (s. 718.112(2)(e)2.a).
Worked example: a 60-unit association charging $450 a month per unit in 2026 adds the $325 a month of SIRS funding from the example above, minus the $150 it already budgets for those items, for a 2027 assessment of $625. That is 139% of the prior year, so the 115% rule applies. The substitute budget can strip out discretionary spending, but it cannot cut the SIRS reserves, because those are required, not discretionary.
| Line | 2026 per unit per month | 2027 per unit per month |
|---|---|---|
| Operating costs (insurance, utilities, maintenance, management) | $300 | $300 |
| SIRS reserves | $150 | $325 |
| Total assessment | $450 | $625 |
| Increase over prior year | +38.9% (above the 115% threshold) |
Boards that see a number like this coming have two levers: phase the funding using a pooled plan the SIRS supports, or borrow for the near-term items so the regular assessment rises less. Both need the study to model them, which is another reason to finish it before the budget cycle.
Draft the budget with the HOA budget calculator.
How Florida condos can fund SIRS reserves
Florida law gives associations four ways to meet SIRS funding: regular assessments, special assessments, lines of credit and loans. Section 718.112(2)(f)2.c says a special assessment, line of credit or loan for this purpose "requires the approval of a majority vote of the total voting interests of the association," which is a majority of all units, not just those voting at a meeting.
| Option | Approval | Conditions | Best for |
|---|---|---|---|
| Regular assessments | Board adopts the budget | If the budget exceeds 115% of the prior year's assessments, the board must also propose a substitute budget without discretionary spending | Steady funding of future items |
| Special assessment | Majority of the total voting interests | SIRS must be updated to reflect the funding method chosen | A near-term repair the reserves cannot cover |
| Line of credit or loan | Majority of the total voting interests | Must cover all previously waived or unfunded reserves, be immediately available to the board, and be disclosed to owners and buyers | Large repairs owners cannot pay at once |
| Pause after a milestone inspection | Majority of the total voting interests | Budgets adopted on or before December 31, 2028; up to two consecutive budgets; milestone inspection within the previous 2 calendar years; funds used for milestone repairs; SIRS required before contributions resume | Buildings paying for repairs found by the inspection |
| Pause after a natural emergency | Board | Whole building uninhabitable after a natural emergency; resume when habitable | Disaster recovery |
The line of credit, loan and post-milestone pause are not available to developer-controlled associations, associations where owners have controlled the board for less than one year, or bulk assignee or bulk buyer associations, under section 718.112(2)(f)2.c(III) and 2.e.
Worked example: special assessment vs loan
Suppose the 60-unit building needs $500,000 of structural repairs now, close to the $496,236 average repair permit OPPAGA reported for 2025 milestone inspections. A special assessment would be $8,333 per unit. A loan spreads it out: at an assumed 8% interest over 10 years, the payment is $6,066 a month, or $101.11 per unit per month, and the association repays about $727,966 in total. At an assumed 7% over 15 years, the payment is $4,494 a month, or $74.90 per unit, with about $808,945 repaid. The rates are assumptions for the arithmetic, not quotes; get real terms from lenders that work with associations.
| Method | Per unit | Total cost to owners | Owner vote needed |
|---|---|---|---|
| Special assessment | $8,333 once | $500,000 | Majority of total voting interests |
| Loan, 8% for 10 years | $101.11 a month for 120 months | About $727,966 | Majority of total voting interests |
| Loan, 7% for 15 years | $74.90 a month for 180 months | About $808,945 | Majority of total voting interests |
The loan costs owners more in total but avoids forcing sales by owners who cannot pay $8,333 at once. Many associations combine the two: a smaller special assessment for the first phase and a loan for the rest. Whatever the board chooses, the SIRS must be updated to reflect the funding method, under section 718.112(2)(f)2.c.
To model your own assessment per unit, use the special assessment calculator.
and send owners the notice with the special assessment letter template.
What happens after the study
Completing the study starts four duties with deadlines. Missing them is a separate problem from missing the study itself.
- Every officer and director signs an affidavit acknowledging receipt of the completed study (s. 718.112(2)(g)10).
- Within 45 days, the association distributes a copy of the study to each owner, or a notice that it is available for inspection and copying on written request (s. 718.112(2)(g)11).
- Within 45 days, the association gives the Division a statement that the study was completed and made available to owners, using the form on the Division's website (s. 718.112(2)(g)12).
- The next budget funds SIRS reserves at least at the level the study recommends, with no waiver (s. 718.112(2)(f)2.b), and SIRS reserves are used only for SIRS components (s. 718.112(2)(f)3).
- If the Department asks, the association provides a copy of the SIRS within 5 business days (s. 718.501(3)).
- Keep the study, the affidavits, proof of distribution and the Division statement in the official records.
Buying or selling a Florida condo: the SIRS in the contract
The SIRS is now part of every Florida condo resale. A prospective purchaser is entitled, at the seller's expense, to "the association's most recent structural integrity reserve study or a statement that the association has not completed a structural integrity reserve study," along with the milestone inspection summary, under section 718.503(2)(a).
Contracts matter too. For contracts entered into after December 31, 2024, section 718.503 requires a conspicuous clause in which the buyer acknowledges receiving the milestone summary and the most recent SIRS, or, if the association has not completed a required study, a conspicuous statement saying so. An association that misses the December 31, 2026 deadline will therefore have that fact written into every sale contract for its units.
- Buyers: read the SIRS funding plan, not just the cover page. The per-unit contribution tells you where the assessment is heading.
- Buyers: ask whether a special assessment, loan or post-milestone pause has been approved, and for which years.
- Sellers: request the SIRS and milestone summary from the association early. Missing documents delay closings.
- Boards: keep the study and summary ready to send, because owners selling will ask for them often.
For producing resale documents on time, see hoa.to resale and estoppel certificates.
Sample owner notice after the study
Section 718.112(2)(g)11 lets the association either send each owner a copy of the study or a notice that it is available for inspection and copying on written request, within 45 days. Here is plain wording a board can adapt; have your attorney review it first.
- Subject: Structural integrity reserve study completed.
- Body: The board received the association's structural integrity reserve study on [date], prepared by [provider and credential]. The study covers [list buildings].
- The study recommends a baseline funding plan of [amount] per year for structural and life-safety components, which is about [amount] per unit per month. The board will consider this in the [year] budget at a meeting on [date].
- You may inspect and copy the full study by sending a written request to [address or portal]. A summary is attached.
- Under Florida law, reserves for the items in this study cannot be waived. The board will explain the funding options, including any proposal for a special assessment, line of credit or loan, which would require approval by a majority of the total voting interests.
Send it by the method your owners have agreed to, post it if your association has a website, and keep proof of delivery with the official records. The Division statement under subsection (g)12 asks you to confirm that you did.
What will not save you: claims that are false
Several things boards hope for are not available under the 2026 law.
| Claim | Reality |
|---|---|
| Owners can vote to waive SIRS reserves | No, for budgets adopted on or after December 31, 2024. SB 722 (2026), which would have allowed a majority vote to waive or reduce them, died in committee. |
| The deadline was extended to 2027 | No. The statute says no SIRS may be completed after December 31, 2026. |
| Two- and three-story buildings need a SIRS | No. The SIRS applies to buildings three habitable stories or higher; smaller buildings and single-family to four-family dwellings with three or fewer habitable stories are exempt (s. 718.112(2)(g)5). |
| A milestone inspection is the same as a SIRS | No. The milestone inspection checks safety now; the SIRS plans funding. A recent milestone inspection can replace the SIRS visual inspection only. |
| Items lasting more than 25 years must be fully reserved | No. Replacement reserves are not required for items with more than 25 years of remaining useful life, though deferred maintenance may be. |
Questions owners should ask the board
Owners have a right to see the study and a strong interest in the funding plan. These questions get to the facts quickly at an owner forum or in writing.
- Has the SIRS been completed, on what date, and by whom? Which credential does the preparer hold?
- Was a milestone inspection from the last 5 years used for the visual inspection?
- What does the baseline funding plan require per year, and what does that mean per unit per month?
- Which components are due for replacement in the next 5 years, and what is the reserve balance for each?
- Is the board proposing a special assessment, a loan or a line of credit? On what terms, and when will owners vote?
- Has the board paused reserves after a milestone inspection? For which budgets, and when do contributions resume?
- Did every director sign the receipt affidavit, and has the statement been filed with the Division?
A board that can answer all seven with documents is in good shape. One that cannot answer the first question on November 19, 2026 has 42 days left.
Choosing a SIRS provider
Choose a provider who can legally sign the study, finish on time and explain the funding plan to owners. With the deadline close, availability may decide it, but check these points.
- Credentials: a Florida-licensed engineer or architect, or a CAI reserve specialist or APRA professional reserve analyst, as the statute requires.
- Written conflict disclosure, especially if the firm or an affiliate wants the repair work.
- Use of your milestone inspection if it is less than 5 years old.
- A baseline funding plan plus at least one alternative, with the effect on regular assessments shown per unit.
- Delivery in time for the affidavits and the 45-day owner and Division steps.
- An editable spreadsheet of components, costs and lives, so the next update does not start from zero.
For what reserve studies cost in general and how to compare firms, see HOA reserve study cost.
How we compiled this
Every rule here comes from the 2026 Florida Statutes text on flsenate.gov, sections 718.103, 718.112, 718.501 and 719.106, read on November 19, 2026. Bill status comes from the 2026 bill histories. The repair permit average comes from OPPAGA Report 26-04 (July 2026), and the inspection cost range from the Senate's 2023 analysis of SB 154. The funding tables are worked examples with stated assumptions. This is general information, not legal or financial advice: ask your association's attorney and reserve professional before the board acts.
We will update this page in January 2027, after the deadline passes, and again if the 2027 Legislature changes the SIRS rules. The 2027 session convenes March 2, 2027.
For everything else that changed in Florida this year, read New Florida HOA laws in 2026.
To keep the study, owner notices and reserve ledger in one place, see hoa.to pricing for condo associations.
Get an email when HOA or condo law changes where you live
When a bill that changes your state's or province's HOA or condo rules is signed or takes effect, we send one short email with what changed, the date, and a link to the official source.
Frequently asked questions
What is the SIRS deadline in Florida?
The study was due by December 31, 2025 for associations existing on or before July 1, 2022, with a combined option alongside a milestone inspection due by December 31, 2026, and the statute says no SIRS may be completed after December 31, 2026.
What does SIRS stand for in Florida?
Structural integrity reserve study, a reserve study required under section 718.112(2)(g) for condo buildings three or more habitable stories tall, covering structural and life-safety components.
How often is a SIRS required in Florida?
At least every 10 years, starting from the condominium's creation, with the catch-up deadline for existing associations ending December 31, 2026.
Can Florida condo owners waive SIRS reserves?
No. For budgets adopted on or after December 31, 2024, an association required to have a SIRS cannot vote to provide no reserves or less than required for SIRS items.
Who can perform a SIRS in Florida?
A Florida-licensed engineer or architect, or a reserve specialist or professional reserve analyst credentialed by CAI or APRA, based on a visual inspection of the building.
Can a condo association borrow to fund SIRS reserves?
Yes. A line of credit or loan is allowed with approval of a majority of the total voting interests, if it covers all previously unfunded reserves, is immediately available to the board and is disclosed. It is not available to developer-controlled associations.
Does a two-story condo need a SIRS?
No. The requirement applies to buildings three habitable stories or higher.
What happens if a board does not complete the SIRS?
A willful and knowing failure to complete it is a breach of the officers' and directors' fiduciary relationship to the unit owners under the statute. Owners and buyers will also see the gap in the association's records.
Official sources
- Section 718.112, Florida Statutes (2026) (checked Nov 19, 2026)
- Section 718.103, Florida Statutes (2026), definitions (checked Nov 19, 2026)
- Section 718.501, Florida Statutes (2026) (checked Nov 19, 2026)
- Section 719.106, Florida Statutes (2026) (checked Nov 19, 2026)
- HB 913 (2025), chapter 2025-175 (checked Nov 19, 2026)
- HB 913 final bill analysis (checked Nov 19, 2026)
- SB 722 (2026), died in committee (checked Nov 19, 2026)
- OPPAGA Report 26-04 (July 2026) (checked Nov 19, 2026)
- Senate fiscal analysis of SB 154 (2023) (checked Nov 19, 2026)
Related