A Florida milestone inspection is a structural inspection that condo and co-op buildings three or more stories tall must have by the end of the year they turn 30, then every 10 years. The first official count, OPPAGA's July 2026 report, found 8,736 phase one and 1,575 phase two inspections completed in 2024 and 2025, 903 repair permits and 54 buildings found unsafe.

Key takeaways

  • Local building officials reported 8,736 completed phase one and 1,575 completed phase two milestone inspections for 2024 and 2025 (OPPAGA Report 26-04, July 2026).
  • About 29% of buildings that finished phase one needed a phase two inspection, which means substantial structural deterioration was found (hoa.to calculation: 2,535 required phase two inspections against 8,736 completed phase one).
  • 93% of the phase one inspections required in 2024 and 98% of those required in 2025 were in coastal counties and municipalities.
  • Building officials granted 1,587 deadline extensions, 94% of them in coastal areas, mostly because engineers were hard to find or overloaded.
  • Repair permits averaged $337,229 in 2024 and $496,236 in 2025, a 47% rise, and ranged from under $1,000 to $30 million.
  • 30 buildings in 2024 and 24 in 2025 were reported unsafe or uninhabitable, and officials said most were not vacated.
  • The data is incomplete: only 71% of jurisdictions reported for 2024 and 64% for 2025, so every count here is a floor, not a total.

What is a milestone inspection in Florida?

A milestone inspection is a structural inspection of a residential condominium or cooperative building that is three or more habitable stories tall, carried out by a Florida-licensed architect or engineer under section 553.899, Florida Statutes. The Legislature created it in 2022 (SB 4-D, chapter 2022-269) after the collapse of Champlain Towers South in Surfside in June 2021.

Florida milestone inspection rules in force in 2026 (s. 553.899, Florida Statutes, 2026)
RuleWhat the statute saysSubsection
Buildings coveredCondo or co-op buildings three habitable stories or more, wholly or partly residential(3)(a)
First inspectionBy December 31 of the year the building turns 30, counted from the certificate of occupancy(3)(a)
RepeatEvery 10 years after the first(3)(a)
Earlier at 25 yearsOnly if the local enforcement agency decides local conditions, such as proximity to salt water, require it(3)(b)
Older buildingsTurned 30 before July 1, 2022: due before December 31, 2024; turned 30 from July 1, 2022 to December 31, 2024: due before December 31, 2025(3)(a)
ExtensionsLocal agency may extend for good cause if an architect or engineer is under contract(3)(c)
ExemptSingle-family to four-family dwellings with three or fewer habitable stories(4)
Owner noticeAssociation tells unit owners within 14 days of the building official's notice(5)
Phase oneVisual examination, due within 180 days of the notice(6), (7)(a)
Phase twoRequired if substantial structural deterioration is found; may include destructive testing(7)(b)
Report to ownersSummary to each owner within 45 days, posted, and on the website if one is required(9)
RepairsMust start within 365 days after the phase two report(11)
ReportingLocal agencies report to DBPR by December 31 each year from 2025(13)

Two definitions help. Phase one is the visual examination of the building's major structural components that every covered building gets. Phase two is the deeper inspection, which may involve destructive or nondestructive testing, required only when phase one finds substantial structural deterioration.

For condo boards, the duty is personal. Under section 718.112(2)(h), a willful and knowing failure to have a required milestone inspection is a breach of the officers' and directors' fiduciary relationship to the unit owners.

Tracking this by hand?

hoa.to sends violation notices, tracks ARC requests and work orders, and saves every letter to the owner's record. Free for 3 months, no card needed.

Milestone inspection vs SIRS vs reserve study

A milestone inspection asks whether the building is structurally safe now. A structural integrity reserve study (SIRS) asks how much the association must save for the structure over time. A traditional reserve study covers everything else the association must eventually replace. Florida condo buildings three or more stories tall need all three in some form, and they are easy to confuse.

Three Florida condo studies compared (2026 Florida Statutes)
QuestionMilestone inspectionSIRSOther reserves
Statutes. 553.899s. 718.112(2)(g)s. 718.112(2)(f)
PurposeStructural safety of the building todayFunding plan for structural and life-safety componentsFunding for other capital items such as pools and paving
Who does itFlorida-licensed architect or engineerLicensed engineer or architect, or a credentialed reserve specialist, based on a visual inspectionBoard estimate or reserve professional
Buildings3+ habitable stories, condo or co-op3+ habitable stories, condo (co-ops under ch. 719)All condos with reserve items
TimingYear the building turns 30, then every 10 yearsAt least every 10 years; final catch-up date December 31, 2026Annually in the budget
Can owners waive funding?Not applicableNo, for budgets adopted on or after December 31, 2024Yes, for non-SIRS items, by the statutory vote
Reported toBuilding official, who reports to DBPRDivision of Florida Condominiums, within 45 daysOwners, through the budget

The two structural duties connect in one place: a milestone inspection completed within the previous 5 years can be used in place of the SIRS visual inspection under section 718.112(2)(g)8, which saves the association paying an engineer twice for the same look at the building.

How many milestone inspections have been done?

Local building officials reported 8,736 completed phase one and 1,575 completed phase two milestone inspections for 2024 and 2025, according to OPPAGA, the Florida Legislature's research office, in Report 26-04 published in July 2026. It is the first statewide count, built from the annual reports building officials must now send to the Department of Business and Professional Regulation (DBPR).

Milestone inspections required and completed, 2024 and 2025 (OPPAGA Report 26-04; rates are hoa.to calculations)
Measure20242025Both years
Phase one required8,7772,88011,657
Phase one completed6,9521,7848,736
Phase one completion rate79%62%75%
Phase two required1,8996362,535
Phase two required per completed phase one27%36%29%
Phase two completed1,3012741,575
Phase two completion rate69%43%62%
Jurisdictions reporting277 of 389 (71%)250 of 389 (64%)n/a

Three points stand out. The 2024 number is larger because it includes every building that turned 30 before July 1, 2022, the backlog the law created. The share needing phase two rose from 27% to 36%, though the 2025 figures come from fewer jurisdictions and include more buildings in the southeast counties. And the completion rates are reporting rates as much as work rates: a building whose inspection was finished but not reported looks the same in this data as one that was never inspected.

Why every number here is a floor

OPPAGA identified 389 local enforcement jurisdictions in Florida. DBPR received 2024 data from 277 of them and 2025 data from 250. Even inside the busiest counties, reporting was patchy: for 2025, 7 of 31 municipal building officials in Broward, 7 of 34 in Miami-Dade and 17 of 39 in Palm Beach did not report. OPPAGA also found reports filed by licensed building code administrators who were not the building official, jurisdictions recorded wrongly, and non-condo buildings included by mistake. The real totals are higher than these counts.

What the data does not include

The report has no inspection fees, no building-by-building list and no count of completed SIRS filings. Some known buildings are simply missing: DBPR told OPPAGA that Walton County's building official reported 36 buildings needing a milestone inspection (35 phase one and 1 phase two), but that submission was not in DBPR's data as of March 2026. DBPR also said that after April 1, 2026 it received late 2024 data from 3 more jurisdictions and 2025 data from 20 more, which the report does not count.

Where the inspections are: the coast

Milestone inspections are overwhelmingly a coastal issue. Of the 8,777 phase one inspections required in 2024, 8,132 (93%) were for buildings in coastal counties and municipalities, and in 2025 the figure was 2,812 of 2,880 (98%), according to OPPAGA. OPPAGA defined coastal municipalities as those with land within three miles of the coastline.

Phase two follows the same pattern: 85% of required phase two inspections in 2024 and 98% in 2025 were coastal. In 2024, Broward, Miami-Dade and Palm Beach each reported between 218 and 543 buildings needing phase two, while most counties reported fewer than 90. In 2025, Miami-Dade reported 308 and Broward 155, and most counties reported fewer than 30.

Where Florida's condo units are

DBPR's county summary of registered condominium projects explains the concentration. Its file lists 24,642 condominium projects with 1,437,386 units and 20,898 managing entities statewide, counting only projects and managers with 8 or more units (DBPR county summary, last modified November 14, 2026; totals summed by hoa.to).

Florida counties with the most condominium units (DBPR county summary, November 2026; shares and averages by hoa.to)
CountyCondo unitsProjectsShare of state unitsAverage units per project
Miami-Dade288,8824,52820.1%64
Broward228,0423,44815.9%66
Palm Beach173,9432,89212.1%60
Pinellas100,9891,8517.0%55
Lee85,4631,9625.9%44
Collier85,3781,6605.9%51
Sarasota54,6251,0503.8%52
Orange50,9295423.5%94
Hillsborough39,1675732.7%68
Brevard33,5016712.3%50

The three southeast counties hold 48.1% of Florida's registered condo units, and most of the state's older high-rise stock. The Senate's 2023 fiscal analysis of SB 154 put the number of condo units at least 30 years old at about 912,376 out of 1,529,764 statewide, or 60%, citing the Florida Bar's 2021 task force report. That older figure counts differently from DBPR's file, so use each for what it measures rather than combining them.

Florida condominium units by age, 2021 estimate (Florida Bar task force via Senate SB 154 fiscal analysis, 2023)
Age of unitsUnitsShare (hoa.to)
50 years or more105,4046.9%
40 to 50 years479,43531.3%
30 to 40 years327,53721.4%
20 to 30 years141,7739.3%
10 to 20 years428,65728.0%
0 to 10 years46,9583.1%

Read with the inspection rules, the age table is a forecast. The 141,773 units that were 20 to 30 years old in 2021 belong to buildings that reach 30 between roughly 2021 and 2031, so the annual flow of first-time inspections continues through the decade, and every building inspected in 2024 comes due again in 2034.

Extensions: the engineer shortage in numbers

Building officials reported granting 1,587 extensions to initial milestone inspection deadlines across 2024 and 2025: 818 in 2024, 90% of them coastal, and 769 in 2025, 98% coastal. Overall, 94% were in coastal counties and municipalities (OPPAGA Report 26-04).

The reasons officials gave were difficulty finding engineers to do the inspections and delays from engineer workloads. Section 553.899(3)(c) only allows an extension where the association has shown good cause and has a contract with an architect or engineer, or shows another circumstance that justifies it. In other words, an association with no engineer under contract has a weak case for more time.

By our calculation, extensions in 2024 equaled 9.3% of the phase one inspections required that year (818 of 8,777), and in 2025 they equaled 26.7% (769 of 2,880). Extensions granted in 2025 may relate to buildings first due in 2024, so treat those ratios as a measure of pressure, not of the share of buildings that got more time.

What the repairs cost: 903 permits

Building officials reported 903 permit applications for repairs identified in phase two inspections: 671 for 2024 inspections, with an average value of $337,229, and 232 for 2025 inspections, with an average of $496,236 (OPPAGA). Values ranged from under $1,000 to $30 million, and the common repair types were concrete, electrical and structural. In 2025, 231 of the 232 permit applications were in coastal jurisdictions.

Milestone repair permit applications by value (OPPAGA Report 26-04; shares calculated by hoa.to from permits with a single reported value)
Permit value2024 permits2024 share2025 permits2025 share
$0 to $1,000365.7%94.0%
$1,001 to $25,00021534.0%7332.7%
$25,001 to $50,0007011.1%2410.8%
$50,001 to $100,000568.8%2913.0%
$100,001 to $250,00010116.0%198.5%
$250,001 to $500,000558.7%2410.8%
$500,001 to $1,000,000447.0%156.7%
Over $1,000,000568.8%3013.5%
Permits in the breakdown633100%223100%

OPPAGA calculated values only from submissions that reported a single permit, which is why the breakdown covers 633 and 223 permits rather than 671 and 232. Using that breakdown, the middle permit fell in the $25,001 to $50,000 band in 2024 and moved up to the $50,001 to $100,000 band in 2025, and the share of permits over $1 million rose from 8.8% to 13.5%.

What that means per unit

A permit is a building-level number, and owners pay per unit. As an illustration only, the 2025 average permit of $496,236 spread across a 64-unit building (the average Miami-Dade project size in DBPR's file) is about $7,754 per unit. Across a 100-unit building it is about $4,962 per unit. Permits over $1 million, which were 30 of the 223 valued permits in 2025, would mean $15,625 or more per unit in a 64-unit building. Engineering, legal and financing costs come on top of the permit value.

To model a repair bill per unit and over time, use the special assessment calculator.

What the inspection itself costs

There is no statewide survey of milestone inspection fees. The only official figure we found is in the Senate's 2023 fiscal analysis of SB 154, citing DBPR's 2022 analysis of an earlier bill: Miami-Dade and Broward recertification inspections "can cost as much as $20,000 to $40,000 for the inspection of a 15 to 20 story condominium." Those are pre-2022 local recertification figures, not current milestone prices, so get at least two written proposals from engineers before you budget.

Unsafe or uninhabitable buildings

Milestone inspections identified 30 buildings in 2024 and 24 in 2025 as unsafe or uninhabitable, across eight counties, and building officials reported that most were not vacated (OPPAGA). For 2024, officials who responded said 5 of the 30 buildings were vacated. For 2025, three officials responded about five buildings and said none were vacated.

Buildings reported unsafe or uninhabitable by milestone inspections (OPPAGA Report 26-04; rates by hoa.to)
Measure20242025
Buildings reported unsafe or uninhabitable3024
Per completed phase two inspection2.3%8.8%
Largest local countsOsceola 10, Pinellas 8, Bay 4, Brevard 4Miami-Dade 23 (19 in Aventura), Orange 1
Reported vacated5 of 300 of the 5 asked about

There is a definitional gap behind these numbers. Section 553.899 requires officials to report buildings deemed unsafe or uninhabitable but does not define either term. The Florida Building Code defines unsafe but not uninhabitable, and officials told OPPAGA they used the Building Code, local ordinances or the inspecting engineer's judgment. A building flagged in one city might not be flagged in the next.

How Florida condo associations are tracked by the state

Two state data sets now track condo buildings, and both are new since 2025. DBPR reported that more than 16,104 associations had created the required online accounts by November 30, 2025 (DBPR, January 7, 2026). Section 718.501(3) required every condominium association to create the account on or before October 1, 2025, with contacts, board members, the manager and, for each building, the number of stories, units, age and construction type.

Florida condo oversight figures (official sources, as dated)
FigureValueSource and date
Associations with DBPR online accountsMore than 16,104DBPR, by November 30, 2025
Registered condo projects (8+ units)24,642DBPR county summary, November 2026
Registered condo units (8+ unit projects)1,437,386DBPR county summary, November 2026
Condo managing entities (8+ units)20,898DBPR county summary, November 2026
Co-op projects and units725 projects, 76,215 unitsDBPR county summary, November 2026
Condo units statewide, 2021 estimate1,529,764 in 27,588 associationsFlorida Bar task force via Senate analysis, 2023
DBPR education reach in 202592 sessions, more than 41,000 attendeesDBPR, January 7, 2026

The gap between 16,104 accounts and 20,898 managing entities is not a compliance rate. The DBPR file counts managing entities of projects with 8 or more units, and one association can manage several projects or the reverse. Treat them as separate measures.

Worked timeline: a building that turns 30 in 2027

Here is how the statutory clocks run for a hypothetical 12-story condo with a certificate of occupancy dated March 15, 1997. It turns 30 in 2027, so its first milestone inspection is due by December 31, 2027, unless the local agency required it at 25 years. The dates after the notice depend on when the building official sends it; we assume April 1, 2027.

Milestone inspection timeline for a hypothetical building (hoa.to example based on s. 553.899 and s. 718.112(2)(h))
StepStatutory clockExample date
Building official sends written noticeStarts the clockApril 1, 2027
Association notifies unit ownersWithin 14 days of the noticeBy April 15, 2027
Phase one report completedWithin 180 days of the noticeBy September 28, 2027
Owners receive the report summaryWithin 45 days of receiving the reportBy November 12, 2027 if the report arrives September 28
Phase two progress report, if deterioration is foundWithin 180 days of the phase one reportBy March 26, 2028
Repairs commencedWithin 365 days of the phase two reportDepends on the phase two report date
Next milestone inspectionEvery 10 yearsBy December 31, 2037

The board's practical deadline is earlier than the statute's. With 1,587 extensions granted mostly because engineers were busy, an association that waits for the building official's letter before calling an engineer is starting late. Get proposals the year before the building turns 30.

Four years of rule changes

The milestone rules have been amended in every session from 2022 to 2025, and not in 2026. If you read a guide written before mid-2025, check it against this list.

Laws that created and changed Florida's milestone inspection rules (flsenate.gov)
BillLawApprovedMain change to the milestone rules
SB 4-D (2022 special session)Ch. 2022-269May 26, 2022Created milestone inspections and the SIRS
SB 154 (2023)Ch. 2023-203June 13, 2023Clarified the rules and replaced the automatic 25-year rule for buildings within 3 miles of the coastline with a local option
HB 1021 (2024)Ch. 2024-244June 14, 2024Further condo reforms, with funding for 65 positions
HB 913 (2025)Ch. 2025-175June 24, 2025Annual reporting by building officials to DBPR, inspector conflict disclosure, SIRS deadline moved to December 31, 2025
2026 sessionNoneNot applicableNo amendment to s. 553.899

The reporting duty added in 2025 is what produced the OPPAGA data on this page. Local agencies report by December 31 each year, DBPR passes the data to OPPAGA, and each new year of data will show whether completion rates rise as the backlog clears.

What boards should do with this data

The data says three things to a board: phase two is common, repair costs are rising, and engineers are scarce near the coast. Plan for all three.

  1. Find your building's certificate of occupancy date and work out the year it turns 30. That year's December 31 is the deadline, then every 10 years.
  2. Ask your building department whether it requires inspections at 25 years. Several coastal jurisdictions can, under section 553.899(3)(b).
  3. Book an engineer early. 94% of extensions went to coastal buildings, and extensions need an engineer under contract.
  4. Budget for phase two. Nearly 3 in 10 buildings that finished phase one needed it, and in 2025 the share was 36%.
  5. Calendar the statutory clocks: 14 days to notify owners of the building official's notice, 180 days for phase one, 45 days to send owners the report summary, and 365 days to start repairs after a phase two report.
  6. Line up funding before the report lands. Section 718.112(2)(f)2.c lets associations fund SIRS items with special assessments, lines of credit or loans, approved by a majority of the total voting interests.
  7. If a milestone inspection was done in the last two calendar years, know the option in section 718.112(2)(f)2.e to pause or reduce reserve contributions for up to two budgets adopted on or before December 31, 2028, with a majority of the total voting interests. It does not remove the need for a SIRS.
  8. Keep the report, the summary, proof of distribution and the board's affidavit trail in your official records.

The milestone inspection and the SIRS are separate duties. For the reserve side, read Florida SIRS cost and the December 31, 2026 deadline.

For the rest of Florida's 2026 rule changes, see New Florida HOA laws in 2026.

Hiring the engineer: what to put in the contract

The engineer's contract is where most milestone problems are prevented, because the statute sets deadlines the association cannot meet without the engineer's cooperation. These terms come straight from the duties in section 553.899 and the practices OPPAGA observed.

  1. Scope by phase. Price phase one separately and ask how phase two will be priced if it is needed. Ask whether your jurisdiction accepts a combined phase one and phase two inspection, as some in Broward, Miami-Dade and Palm Beach counties do.
  2. Deadlines tied to the statute. The phase one report must be done within 180 days of the building official's notice. Put that date, minus a margin, in the contract.
  3. The summary. The statute requires a sealed report plus a separate summary that the association must send owners within 45 days. Make delivery of both, in a format you can post and email, part of the deliverable.
  4. Conflict disclosure. Section 553.899(12) requires written disclosure if the inspector intends to bid on the repair work, and an undisclosed relationship makes the contract voidable. Ask for the disclosure in writing before you sign.
  5. Who files with the building official. The report goes to the association and the building official. Agree who sends it and keep proof of the date.
  6. Repair scoping. If phase two is required, ask the engineer to separate substantial structural deterioration from preventive repairs, so the board can sequence work within the 365-day start window.
  7. Reuse for the SIRS. A milestone inspection done within 5 years can replace the SIRS visual inspection. Ask the engineer to structure findings so the reserve professional can use them.

Get at least two proposals. The only official price point we found, $20,000 to $40,000 for a 15 to 20 story building, comes from pre-2022 Miami-Dade and Broward recertification work, and the extension data shows engineers have been in short supply since, so local quotes are the only reliable number.

What buyers and owners should ask

For a buyer, the milestone report is one of the most useful documents in the sale. Ask for it, along with the phase two report if one exists and the SIRS.

  • Has the building had its milestone inspection, and when is the next one due?
  • Did phase one find substantial structural deterioration? If yes, has phase two been completed?
  • Were repairs required, has a permit been pulled, and did work start within the 365-day window?
  • How are the repairs being paid for: reserves, a special assessment, a loan or a line of credit? What is each unit's share?
  • Has the board paused reserve contributions after the inspection, and if so, for which budget years?
  • Has the association filed its SIRS statement with the Division?

A building with a completed inspection, a funded repair plan and a current SIRS is in a stronger position than one where the inspection is overdue, whatever the asking price says.

How we compiled this

The inspection, extension, permit and unsafe building figures come from OPPAGA Report 26-04, Milestone Inspection Reporting Data 2024 and 2025 (July 2026), which analyzed the data building officials submitted to DBPR. Condo project and unit counts come from DBPR's County Summary Report CSV, last modified November 14, 2026, which we summed by county. Account counts come from DBPR's January 7, 2026 post. Age estimates and the inspection cost range come from the Senate fiscal analysis of SB 154 (2023). Rules come from the 2026 Florida Statutes. All percentages, rates and per-unit illustrations are our own calculations, labeled as such.

DBPR receives the next round of building official reports by December 31, 2026. We will update this page when OPPAGA or DBPR publishes 2026 figures. This is general information, not legal or engineering advice.

If your board runs inspections, reserves and owner notices on spreadsheets, see hoa.to pricing for condo associations.

Frequently asked questions

What is a milestone inspection in Florida?

A structural inspection by a Florida-licensed architect or engineer of a condo or co-op building three or more habitable stories tall, required by section 553.899 by December 31 of the year the building turns 30 and every 10 years after.

How many milestone inspections have been completed in Florida?

Building officials reported 8,736 completed phase one and 1,575 completed phase two inspections for 2024 and 2025, from the 71% and 64% of jurisdictions that reported, according to OPPAGA's July 2026 report.

How often does a milestone inspection find problems?

About 29% of buildings that completed phase one in 2024 and 2025 needed a phase two inspection, which is required when substantial structural deterioration is found. In 2025 alone the share was about 36%.

How much do milestone inspection repairs cost?

Repair permit applications averaged $337,229 for 2024 inspections and $496,236 for 2025, and ranged from under $1,000 to $30 million, according to OPPAGA.

Do buildings need a milestone inspection at 25 years?

Only if the local enforcement agency decides local conditions, such as proximity to salt water, require it. Otherwise the first inspection is due by December 31 of the year the building turns 30.

Can the milestone inspection deadline be extended?

Yes. The local enforcement agency can extend the initial deadline for good cause if the association has contracted with an architect or engineer. Officials granted 1,587 extensions in 2024 and 2025.

Is a milestone inspection the same as a SIRS?

No. The milestone inspection checks the structure under section 553.899. The structural integrity reserve study plans reserve funding for structural components under section 718.112(2)(g). A milestone inspection done within 5 years can replace the SIRS visual inspection.

Who pays for the milestone inspection?

The association pays for it as a common expense, so unit owners pay through their assessments. Repairs found by the inspection are also association costs, often funded by reserves, special assessments or loans.

Official sources

Related

This guide is general information, not legal, financial, or tax advice. Rules vary by state and province; confirm specifics for your community with a qualified professional.

Run the money and the meetings from one place

hoa.to handles dues, reserves, budgets, violations, and board communications for HOAs and condos, with the calculators and templates built in.